New packaging way for steel structures saves 40% of unloading time
In the traditional steel structure transportation scenario, difficult unloading and long time have been common pain points that troubled many buyers. The bulky components require manual assistance for disassembly and hoisting, and the cramped space in the container leads to chaotic stacking. It often takes several hours or even half a day to unload a truckload of components, which not only delays the construction progress, but also increases the cost of manpower and equipment.
The latest steel frame packaging solution of Canglong Group makes steel structure loading and unloading more convenient, saving manpower and cost.
Different from the traditional packaging method of making do with the container space, Canglong Group's packaging steel frame design has anchored the core goal of deep adaptation to the container from the beginning. We accurately measure the internal dimensions of mainstream containers (such as 20-foot and 40-foot dry cargo containers) and customize and develop standardized steel frames. Its length, width, height, load-bearing beam spacing, and hanging point position are all perfectly matched with the inner wall of the container. No additional cutting or adjustment of the frame is required. The components only need to be simply positioned before entering the box to quickly complete the fixing of the frame and the container. This design eliminates the tedious steps of repeated measurement and temporary reinforcement in traditional packaging, and the single frame assembly time is shortened by 60%, which fundamentally improves the packaging efficiency.
Double guarantee of safety and efficiency
The stability of steel components is the core of transportation safety. The Canglong steel frame adopts a well-shaped reinforcement structure, with customized straps and rubber buffer pads to form an integrated binding between the components and the frame. Whether it is H-shaped steel, square tubes or steel plates, they are firmly fixed after being placed in the frame, with zero shaking and zero displacement during transportation.
What is more noteworthy is the modular characteristics of the frame. Each steel frame can independently carry 1-3 tons of components, and standard gaps are reserved between the frames. The components can be placed in the box to achieve modular stacking that is stable, completely saying goodbye to the risk of component extrusion deformation and stacking collapse in traditional packaging.
Open the box and drag it, unloading efficiency increased by 40%
When the container arrives at the construction site, the operator does not need to wait for the large lifting equipment to enter the site. He only needs to open the door and release the two quick locks on the top of the frame to drag the entire steel frame out of the container. Only one worker is needed to assist and a small forklift is needed to drag the components weighing several tons to the construction area. According to actual measurements, it takes 3-4 hours to unload a truck (about 20 tons) of steel structure in the traditional way, but it only takes 1.5-2 hours after the secondary packaging solution, and the unloading efficiency is directly increased by 40%!
What surprised the customer even more was that the steel frame itself can be used directly as a temporary stacking rack for construction. After the components are dragged to the site with the frame, there is no need for secondary handling. They can be directly taken from the frame for installation, truly realizing the seamless connection of transportation-storage-construction, further shortening the project cycle.
From saving time to saving cost
For the engineering party, time is cost. Canglong Group's steel frame packaging solution not only shortens the unloading time by 40%, but also reduces the logistics cost for customers by 15%-20% by reducing manual operations, reducing equipment rental (such as large cranes), and avoiding component loss and other hidden benefits.
From packaging in the factory to unloading at the construction site, Canglong Group uses a set of customized steel frames to make steel structure unloading no longer a difficult link in the engineering chain, but a booster to promote the efficient implementation of the project.
Choosing Canglong is not only choosing a packaging method, but also choosing an engineering wisdom that makes complexity simple.